Electrical installation testing and protocol generation
Electrical installation testing requires careful documentation โ measurement protocols, compliance confirmations, periodic inspection schedules. Fazero automates this process: record measurements, generate PDF protocols according to IEC 60364 standard, and have all documentation in one place.
All required tests according to IEC 60364 standard. Automatic validation.
Resistance, voltage, insulation and other measurements with instrument data recording.
PDF protocol generation with all measurement data and compliance confirmation.
Complete installation history, periodic inspection schedules and document archive.
Work without internet connection. Data automatically syncs when connected.
Automatic checking and validation according to national and international standards.
All modules, unlimited workers and documents.
How to perform electrical installation tests
Resistance, voltage, and insulation measurements
Automatic PDF protocol creation
Installation history and document archive
Automatic checking according to IEC 60364